Surfacing solutions · Beta
Measure it. Build it up. Find the likely starting point.
A visible planning draft for early quantities and fleet routing. It does not replace a survey, material specification, confirmed transport plan or machine allocation.
Guided planning workspace
Start with the job, not the calculator
One calculation route keeps asphalt laid, asphalt removed and road planings supplied separate. Every assumption stays visible and editable.
01
Measure the area
Use more than one shape where the site is not a single rectangle.
02
Build up the layers
Estimate compacted asphalt across one or more layers, then check the likely paver class.
Compacted asphalt starting point: 2,400 kg/m³. Change it when project or material evidence gives a better figure.
03
Set the load assumptions
Allowance and payload affect the planning figure, so neither is hidden.
04
Check the job fit
Width, access, site condition and hire route narrow the fleet to a likely starting point. MAC still confirms the machine.