The machine
Which plant is moving? A paver, planer or supporting kit is not the same load, and the quote should name it.
QUALITY»SAFETY»ENVIRONMENT
Sales & 24/7 emergency call-outs · Tipton, West Midlands

Plant haulage guide
A plant-move figure is only useful if it says which machine is travelling, where from and to, when it must arrive, and whether delivery and collection are in. Use this checklist before you compare quotes.
View plant haulage →» Straight answer
Getting the right plant to site, on the right day, is half the job. A useful plant-move quote names the machine, the collection and delivery points, the date it must arrive, and whether loading and collection are in.
This is a checklist, not a price list and not a legal weight table. MAC will still review the actual machine and the move with you.
Which plant is moving? A paver, planer or supporting kit is not the same load, and the quote should name it.
Where is it collected and where does it need to land? A yard-to-site move is not the same as a site-to-site shift.
The gang and the materials wait if the machine is late. Ask when it will be on site and ready for the shift.
Heavy plant has to be loaded, secured and matched to the right trailer. Ask who is doing that work.
Delivery and collection are not always one figure. Ask how many vehicles the move needs.
If the same business supplies the plant and the transport, there is one diary. If haulage is a third party, you may be chasing two.
» What to watch for
MAC's core patch is the West Midlands, roughly 60 miles, where turnaround is quickest. Larger or longer programmes can move nationally. If a job sits at the edge of sensible travel, ask for that to be said up front.
Ask whether getting the machine back is in the figure. A cheaper line can grow once the return trip is added.
MAC haulage is mobilisation for surfacing work. It is planned with the plant and the programme, not as a generic parcel slot.
Owning the low-loaders means MAC controls the diary, but a late ask still needs a straight yes or no, not a promise that cannot be held.
» Related reading
The published MAC article this checklist is drawn from: what plant haulage is, why timing matters, and how own transport keeps one diary.
Read the article →Transport is one line. Check plant, people, supporting kit and what you still arrange before you pick the lowest figure.
Compare the whole quote →
» Case study
MAC's role: emergency planing and resurfacing
MAC mobilised a 2m planer and crew, tippers, surfacing crew and plant, low loaders, spray tanker, lining and materials to plane and resurface a 320t patch over 3 lanes of the M5.
This job includes low-loader movements as part of a wider emergency surfacing package. It does not show a standalone plant-haulage booking.
Read the case study →» Need help choosing?
Send what is moving, where from and to, and when it must arrive. MAC will give a straight answer on timings.